www.billelar.dk                                 Back to overview

COMMENTS TO MY PAGE "ART POSTCARDS WITH A RAILWAY MOTIVE"


<font size="5" face="Times New Roman"></font>


Københavns Metro

Københavns Metro (The Copenhagen Metro) is a light rapid transit system in Copenhagen, Denmark, serving the municipalities of Copenhagen, Frederiksberg, and Tårnby. First opened in 2002, the driverless light metro supplements the larger S-train rapid transit system, and is integrated with  trains and municipal buses. The metro operates four lines and 44 stations, 30 of which are underground. The M1 and M2 lines serve western and eastern Amager (including Copenhagen Airport) respectively, sharing a common line between the city centre and Vanløse. The M3 is a wholly underground circular line connecting Copenhagen Central Station with Vesterbro, Frederiksberg, Nørrebro, Østerbro and Indre By. The most recent line, M4, supplements the M3 line and connects it to Nordhavn and Sydhavn, as well as Valby via Copenhagen South.  In 2023, the metro carried 120 million passengers. Along with the New York City Subway and Chicago "L", the Copenhagen Metro is one of three rapid transit systems in the world to operate 24/7 throughout their city limits. The system is owned by Metroselskabet (The Metro Company), which is owned by the municipalities of Copenhagen and Frederiksberg, and the Ministry of Transport. The M1 and M2 use 34 trains of the Hitachi Rail Italy Driverless Metro class and stationed at the Control and Maintenance Center at Vestamager. The trains are 2.65 m (8 ft 8 in) wide and three cars long; their 630 kW (840 hp) power output is supplied by a 750-volt third rail. The metro trains were originally planned to be four cars long, but trains were reduced to three cars per set as a savings measure. Platforms are – although shorter than originally planned – built to accommodate trains with four cars, and the automatic doors can be modified accordingly should the need arise.Trains run continually, twenty-four hours a day, with the headway varying from two to four minutes in daytime, with longer intervals during the night. A fifth line, M5, is currently in the planning stages and will serve Refshaleøen as well as the under-construction Lynetteholmen neighbourhood, with an expected opening date in 2035.
 
June 22nd,  2025

 

Creative Commons License 
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported License.


www.billelar.dk