Storstrømsbroen 1937

Storstrømsbroen was one of the most important Danish infrastructure projects of the 1930s. Opened in 1937, it connected Masnedø and Falster and replaced the railway ferry between Orehoved and Masnedø. Together with the Masnedsund Bridge, it created a continuous rail connection between Zealand and Lolland-Falster. Before 1937, railway passengers and goods travelling between Copenhagen and Lolland-Falster had to cross the Storstrøm by train ferry. This was a significant bottleneck. The Danish State Railways, DSB, wanted to improve the route towards Gedser and the international ferry connection to Warnemünde, which connected Denmark with Germany and the wider European railway network. The bridge carried a single railway track, as well as a road and a pedestrian/cycle path. It was approximately 3.2 km long, making it an extraordinary engineering achievement for its time. Its largest span was about 136 metres. The project was designed under the Danish State Railways' bridge department, with Anker Engelund as the principal designer. The British company Dorman, Long & Co. supplied and constructed the steel superstructure, while the Danish company Christiani & Nielsen worked on the concrete structures and earthworks. The bridge was  deliberately designed as a combined transport connection, reflecting the changing role of infrastructure in Denmark during the interwar period: Faster journeys: Trains could pass directly between Zealand and Falster instead of having to be loaded onto and unloaded from a ferry. Greater reliability: Rail traffic was less dependent on ferry schedules, weather and the operational limitations of a sea crossing. Better freight transport: Goods could move more continuously through the Danish railway network. Improved international connections: The bridge strengthened the Copenhagen–Falster–Gedser route and its connection to Germany and continental Europe.  The Storstrømsbroen project should be understood alongside the Little Belt Bridge, opened in 1935. These two projects were part of a major transformation of Danish transport infrastructure during the 1930s, where DSB introduced its famous lyntog (express trains) in 1935, capable of speeds around 120 km/h on suitable routes. The Little Belt and Storstrøm connections helped make faster, more continuous railway journeys possible by eliminating important ferry interruptions. The original bridge remained an important railway connection for almost 90 years. Its limitations eventually became increasingly apparent: it has only a single railway track and was not suitable for modern high-speed railway requirements. The Danish authorities are therefore replacing it with a new Storstrøm Bridge designed for contemporary road and railway traffic. The old bridge was officially closed to road traffic in 2026, while the new infrastructure is intended to provide the next generation of the Zealand–Lolland-Falster connection.



September, 7th ,  2026

 

Creative Commons License 
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported License.


www.billelar.dk